How Long Does a Kitchen Remodel Take?

After figuring out how much a kitchen renovation will cost, you are probably wondering how long it takes. A fresh kitchen design is not only satisfying, but it can also increase resale value and functionality. It can also make your kitchen more comfortable, energy efficient, and safer. But it’s also one of the most time-consuming and expensive renovation projects. Knowing how long your kitchen remodel will take will help you plan accordingly. However, the duration of your project will depend upon various factors.

Beautiful and elegant kitchen remodel

In this guide, our experienced kitchen remodelers will discuss the average timeline for a kitchen renovation.

How Much Time Does a Kitchen Remodel Take?

The time required for remodeling a kitchen varies from project to project based on various factors. Typically, kitchen remodel projects are divided into two sections, the pre-construction and construction phase. Let’s discuss each stage in detail below:

✅Pre-construction Phase

Every kitchen remodeling project begins with the pre-construction phase. During this phase, you will work with the kitchen remodeling contractors you have chosen to prepare for the project. The pre-construction phase includes:

  • Planning and Design: Before picking up the sledgehammer, the kitchen remodeling contractors you are working with will collaborate with you to decide on the scope of your project. You will also set a budget and select a design that suits your style, preferences, needs, and budget. 
  • Permits and Approvals: Once you give your go-ahead, the kitchen remodeling team will help you obtain the required permits and approvals from the local authorities. This process may take a few days or several weeks, depending on local regulations and the complexity of your project. 
  • Material Selection: After obtaining the required permits and approvals, it is time to select the materials you need for your project. While at it, choose high-quality materials, such as countertops, flooring, cabinets, and other fixtures, to get value for your money. Also, ensure that the materials suit your budget, preferences, and style.

✅Construction Phase

Once everything is in order, your contractor will start the second phase of the kitchen remodel project. During the construction phase, your contractor will follow these steps:

  1. Demolition: Now that you’ve selected the items you want to upgrade, it’s time for the contractor to get their hands dirty. Old kitchen cabinets, flooring, countertops, and other fixtures that need upgrading will be removed during this stage. Although it sounds easy, the demolition process can take several days to a few weeks depending on the size of your kitchen, its design, and the number of items that need upgrading. 
  2. Electrical Plumbing and Structural Upgraded: The second stage of the construction phase involves upgrading your kitchen’s plumbing, structural, and electrical systems. The process may take several days to a few weeks depending on the kitchen design and the complexity of the upgrades. 
  3. Local Authority Inspections: Depending on where you live, you might have to get city inspections and a final sign-off from the local authority before closing up the walls, especially for gas lines and electrical work. Local authorities generally conduct inspections once the project is finished to ensure safety and compliance. Check out with the local authority in your city to find out if final inspections and sign-offs are required for your project. 
  4. Installation: After upgrading your electric, plumbing, and structural systems, it’s time to bring in your new countertops, flooring, cabinets, and other fixtures. The installation process typically takes several weeks, depending on your kitchen size and the number of items installed. 
  5. Finishing Touches: after installing new items, your contractor will add the final touches to your kitchen. This often involves trim work, lighting fixtures, painting, and more. On average, this process may take several days to a week, depending on your kitchen size and the scope of work. 
  6. Clean-Up and Inspection: Finally, the contractor will ask you to perform the final inspection to ensure everything has been done to your satisfaction. Immediately after you give the green light, the contractors will clean up the site to ensure safety. This stage often takes a few days to a week.

Factors that Will Impact the Length of Time it Takes to Complete Your Kitchen Remodel

Now that you know everything that goes into a kitchen remodel project, you are probably eager to find out how long your kitchen remodel will take. Typically, kitchen renovation projects take anywhere from several weeks to several months, depending on the scope of the project, availability of finishes and materials, and the contractor. Let’s discuss the factors that will impact the duration of your kitchen remodel in detail below.

Completed Kitchen Remodeling Project

✅Scope of the Project

The scope of the kitchen remodel project is the most significant factor determining the project’s length. In simple terms, the scope of a kitchen remodel is the amount of work that must be done. Simple renovations like replacing the cabinets and updating the countertops will be quicker than full-scale upgrades. Simple renovations often take a few weeks to a month, whereas full-scale renovations that involve upgrading the electrical and plumbing systems, tearing down the walls, and installing new appliances, take several months to complete.

✅The Size of the Kitchen

Apart from the scope of the work, the size will also determine the length of the project. Of course, the larger the kitchen, the longer it takes to complete the renovation. Minor kitchen renovations typically take several weeks, while large renovations take several months.

✅The Remodeling Company You Have Chosen

Another significant factor that will affect the length of your project is the kitchen remodeling company you are working with. A company with state-of-the-art tools and equipment coupled with experienced and licensed contractors will likely complete the project faster than one with limited resources. So, ensure the remodeling company you have in mind has multiple contractors, including plumbers, designers, electricians, and carpenters.

✅The Complexity of Upgrades

The complexity of the required upgrades will also impact the timeline of your kitchen remodel. Projects that require a full-scale upgrade on the HVAC, plumbing, and electrical systems take longer than projects that require simple upgrades.

✅Material Availability

Material availability is another significant factor that will affect the length of your renovation project. For instance, your project will take longer if you use custom-made materials such as flooring, cabinets, and countertops. This is because these materials will have to be manufactured before being delivered. That means your kitchen will take a few more weeks or months, depending on the manufacturer, complexity of the materials, and delivery. But the wait is worth it since custom-made materials offer several benefits, including:

  • Unique design
  • Increased value
  • Improved functionality
  • High-quality materials
  • Perfect fit

On the other hand, your kitchen remodel project may take less time to complete if you go for readily available materials. This is because these materials can be purchased off the shelf, eliminating the time required for manufacturing and delivery. However, buying low-quality materials off the rack can be costly in the long run.

✅Permits and Approvals

Finally, permits and approvals from the local authorities will also impact the length of your kitchen remodel. It takes several weeks to obtain the required permits and approvals from the local authorities, depending on where you live and the project’s complexity. Ensure you get all the required permits and licenses before starting the project to avoid delays and setbacks.

✅Unexpected Issues

Unfortunately, unexpected issues may come up during your kitchen remodel. This might push back the completion date. Fortunately, you can always stay on schedule by planning for any eventuality.

Quick Tips for a More Efficient and Faster Kitchen Remodel

Completing a kitchen remodel should not always be a stressful experience. You can always ensure it’s faster and more efficient by working with the right contractor. Ultimately, the success and quality of your remodel will depend upon the contractor you work with. So, take your time to ensure the contractor you have in mind has the proper license and insurance. Talking with past customers to learn about their experiences working with that contractor is also essential. Above all, pick a company with whom you are comfortable working with. On your part, plan properly and budget for emergencies to minimize delays.

Are you planning a kitchen remodel in San Diego County? If you are, our top remodeling contractors are ready to tackle your kitchen remodel. Contact our San Diego home remodeling company today to get your free estimate.

Inquiries

With over a decade of experience, our team of designers and contractors are confident we can turn your dreams into a reality. With no obligation, we are happy to discuss your home renovation needs and help come up with perfect solutions that fit your budget.

You dream it. We build it. You live it.

Call us today for your free consultation! Sunday appointments are available.

Lic. #1041074

Questions? Please call us at your earliest convenience: (619) 373-9948

Contact Information

Head Office
​2801 Camino Del Rio S, Suite 318-4
San Diego, CA 92108
Tel: 619-373-9948
Info@edisonhomeimprovement.com

Hours of Operation
Appointments:
Monday- Friday 9:00AM – 6:00PM
Sunday By Appointment Only

For Scheduling Free Estimates:
Monday – Friday 8:30AM – 5:00PM

Contact Form

Get Your FREE Estimate Today

Get Your FREE Estimate Today

Schedule a free estimate